Hwy 10 Road Construction

Social Media Icons

A A A

The Ministry of Transportation (MTO) has commenced construction on Hwy 10 which is expected to continue through to the Fall of 2019. The work consists of grading, drainage, granular base & paving.

There will be lane closures throughout the construction area during most of the work.

Construction operations shall be carried out in such a manner as to maximize safety and minimize disruption to traffic flow and operation. Construction noise levels will be based upon a variety of factors such as time and location of operation, size and concurrent use of equipment and staging of construction. Standard noise mitigation measures pertaining to equipment maintenance and operation have been implemented as part of the contract package. The measures in place shall prevent unnecessary noise and restrict the idling of equipment.

The contractor AECON Infrastructure or the Contract Administrator representing the Ministry of Transportation can be reached at the following locations and/or phone numbers:

AECON Infrastructure Mr. Shane Fuller Office: (416) 293-7004
e-mail: [email protected]
AECON Infrastructure Mr. Colin Etmanski Office: (416) 297-2600
e-mail: [email protected]
KIHL Construction Management Mr. Joe Lascala Office: (416) 996-0471 e-mail: [email protected]
MTO Shelburne   Office: (519) 925-4325

Please do not hesitate to contact either Shane Fuller, Colin Etmanski or Joe Lascala if you have any questions or concerns.

Tuesday, August 1, 2017 - 4:45pm
TOWN OF MONO Social Media icons © 2016 Town of Mono
347209 Mono Centre Road (Dufferin County Road #8) | Mono,ON, L9W 6S3
Phone: (519) 941-3599 | Fax: (519) 941-9490   
Email: [email protected]
  Sign in
Privacy Policy
For technical queries contact [email protected]