Island Lake Bridge Opening

Social Media Icons

A A A

June 22nd, 2013

The new boardwalk at Island LakeThe Grand Opening Celebration for the "Bridge the Gap" campaign will be held on Saturday, June 22 starting at 11:00 am at Island Lake Park in the Town of Mono.

There will be an official ribbon cutting, a piper and band. The Mayor of Mono/Warden of Dufferin County Laura Ryan, Orangeville Mayor Rob Adams, MP Dave Tilson, MPP Silvia Jones & representatives of CVC Foundation will all be there.

Friends of Island Lake  (their Facebook page) will be hosting a BBQ so come rain or shine.

The opening celebration is taking place on the north shore of the trail at the bridge entrance. Parking is available at the Orangeville Fairgrounds on 5 Sideroad and walk to the site.  Those that require assistance, golf carts will be available to transport people.

» Map to parking area

Saturday, June 22, 2013 - 11:00am
TOWN OF MONO Social Media icons © 2016 Town of Mono
347209 Mono Centre Road (Dufferin County Road #8) | Mono,ON, L9W 6S3
Phone: (519) 941-3599 | Fax: (519) 941-9490   
Email: [email protected]
  Sign in
Privacy Policy
For technical queries contact [email protected]